Kenya – Power Interconnection Project (KTPIP)

 

Tanzania and Kenya have joined forces to construct a 400 kV interconnection line that runs from a proposed 400 kV substation at Isinya near Nairobi in Kenya up to Arusha in Tanzania (210 km) and further to a planned 400 kV substation in Singida (300 km). Works in Hongmai comprise the following:

  • Lot K1: Approx. 96 km of 400 kV transmission line between Isinya Substation and the Kenya-Tanzania border.

Hongmai’s services

Phase 0: Procurement

  • Contract negotiations and preparation of contract documents with the  contractors

Phase 1: Pre-Design

  • Review of contractor’s pre-design
  • Negotiate details with contractor
  • Starting make the production drawings

Phase 2: Production

  • Sign contract
  • Production drawings confirmation
  • Material Purchase
  • Production

Phase 3: Shipment

  • Completion inspect
  • Booking ship
  • Shipment

Phase 4: Online technical support

  • Installation drawings making
  • Online support
  • On-site support

Client

Kenya Electricity Transmission

Period of implementation

2017 – 2020